GREENICE

CURE SYSTEM

Cure. Densify. Hydration Control.

GreenIce is New Green Umbrella’s concrete cure system designed to control hydration, densify the slab, and improve long-term concrete durability from day one.

Building better slabs

One system for curing, densifying, and controling hydration in concrete.

GreenIce is applied during placement and finishing to help lock in hydration, strengthen the slab, and reduce the need for separate, sealing, hardening, or densifier steps. ( etc) for later)

1

The Cure

Provides full hydration for stronger, more durable concrete—allowing foot traffic in 7-days versus the standard 28-day cure.

2

Densification

Strengthens the slab during the finishing process and helps create a tighter, more durable concrete slab.

3

Hydration Control

Designed to reduce cracking, curling, crazing, and pre-term degradations.

Our Chemistry

One System.

IceStart is applied during placement and panning to help control hydration and reduce moisture loss.

IceStop is applied after finishing to cure, densify, and ensures longevity of your slab.

IceCap is the system’s optional high-performance finishing add-on, enhancing reflectivity and finish aesthetics.

The Simplified Application Process

4-step process.

3

IceStop


Apply after finishing. IceStop cures, densifies, and strengthens the slab in one streamlined step.

4

Cap or Profile


Add IceCap or polish the slab depending on the finish level and performance package desired.

2

IceStart


Apply during bull float and panning. IceStart controls moisture levels before it escapes and supports the finishing process.

1

First Pour


Standard placement. Nothing new—just the usual start to the pour.

AIA Courses

Knowledge is Power.

Explore NGU’s AIA-approved education sessions covering ITCP floors, concrete performance, and smarter specification strategies.

Application Guide


3

Apply IceStop


Once the slab can be walked on without marring, apply IceStop.

4

Allow dwell time


Maintain a 30-minute dwell time, then allow the slab to dry.

Jobsite notes

  • Professional use only

  • Follow ACI guidance for cold or hot weather placements

  • Use standard finishing tools and workflow

  • Optional IceCap / polishing can follow based on project goals

2

Continue finishing


Proceed with standard finishing workflow. Do not apply IceStart during final blading.

1

Apply IceStart


Apply during bull float and continue through the panning process.