GREENICE
CURE SYSTEM
Cure. Densify. Hydration Control.
GreenIce is New Green Umbrella’s concrete cure system designed to control hydration, densify the slab, and improve long-term concrete durability from day one.
Building better slabs
One system for curing, densifying, and controling hydration in concrete.
GreenIce is applied during placement and finishing to help lock in hydration, strengthen the slab, and reduce the need for separate, sealing, hardening, or densifier steps. ( etc) for later)
1
The Cure
Provides full hydration for stronger, more durable concrete—allowing foot traffic in 7-days versus the standard 28-day cure.
2
Densification
Strengthens the slab during the finishing process and helps create a tighter, more durable concrete slab.
3
Hydration Control
Designed to reduce cracking, curling, crazing, and pre-term degradations.
Our Chemistry
One System.
IceStart is applied during placement and panning to help control hydration and reduce moisture loss.
IceStop is applied after finishing to cure, densify, and ensures longevity of your slab.
IceCap is the system’s optional high-performance finishing add-on, enhancing reflectivity and finish aesthetics.
The Simplified Application Process4-step process.
3
IceStop
Apply after finishing. IceStop cures, densifies, and strengthens the slab in one streamlined step.
4
Cap or Profile
Add IceCap or polish the slab depending on the finish level and performance package desired.2
IceStart
Apply during bull float and panning. IceStart controls moisture levels before it escapes and supports the finishing process.1
First Pour
Standard placement. Nothing new—just the usual start to the pour.AIA Courses
Knowledge is Power.
Explore NGU’s AIA-approved education sessions covering ITCP floors, concrete performance, and smarter specification strategies.
Application Guide
3
Apply IceStop
Once the slab can be walked on without marring, apply IceStop.4
Allow dwell time
Maintain a 30-minute dwell time, then allow the slab to dry.
Jobsite notes
Professional use only
Follow ACI guidance for cold or hot weather placements
Use standard finishing tools and workflow
Optional IceCap / polishing can follow based on project goals
2
Continue finishing
Proceed with standard finishing workflow. Do not apply IceStart during final blading.1
Apply IceStart
Apply during bull float and continue through the panning process.